- relevance
- date |
- Sort by :
-
Making A List
- Reviews
Server Tower. It could handle four 5.25" drives and five 3.5" drives. And, because it was a server tower case, it also came with a 300-watt power supply. Very nice. Thank you, Rafael. I told Rafael to ship it second-day air so that I would have it by Friday....
-
Moving It All
- Reviews
between the two facilities until everyone and every server and workstation were in place. Plumer chose the latter alternative and as a result: "We had no downtime. We were able to lease fiber between the Presidio and San Rafael, giving us a 10 GB pipe. That...
-
Moving It All
- Reviews
data connections between the two facilities until everyone and every server and workstation were in place. Plumer chose the latter alternative and as a result: "We had no downtime. We were able to lease fiber between the Presidio and San Rafael, giving us a...
-
Mexican Press Attaché Steals Six BlackBerries From US Officials, Calls It An Accident
- News
at a summit of US, Canadian and Mexican leaders in New Orleans. Members of the delegations were instructed to leave all of their electronic devices at the door and it appears Rafael Quintero Curiel had some sticky fingers. Curiel is Mexico’s lead press advance...
-
Fire Burns for Three Hours at Apple HQ
- News
News that the fire may have started under an air conditioning unit on the second floor. Workers in the building first called in the fire afraid smoke in the area could be a fire on the roof of the building. Senior Communications Dispatcher Rafael Salcedo says...